Freelancer Bureau of Inspection...EUROSPECT

Go to content

Menu

References, Projects and Activities

MY SPECIFIC WORK EXPERIENCE (Projects and activities) since 1981 ~ 1993 (EGYPT) and 2009 ~ 2021 (GERMANY)
This is a list of Clients / suppliers whose products I have inspected (CV / Referances)

General Scope of Inspections:
Verification, inspection and Reporting of Industrial, Marine & Machine Components at manufacturer’s Works like:
  • Engines, Gas Turbines, Gear boxes, Pumps, Castings, Motors, Transformers, Lifts..
  • NDE, Mechanical Tests, Tensile tests, bending tests, Functional tests, Welding, etc...
  • FAT (Functional & Factory acceptance tests for Gear Boxes, Turbines, Pumps, Control Panels / Switch Bords etc.).
  • Circuit Breaker Type: 3AP1FG, and Arrester Type: 3EP4 120-2PJ31-1DR1-Z
  • 220kV Gas-Insulated Switchgear
  • Marine & Draft Survey (Suez Canal, Egypt)
  • Cable Inspection
Different Clients
  • Deltatek Offshore
  • SAMSUNG ENGINEERING CO., LTD.
  • Siemens Turkey
  • BFI (Brunei Fertilizer Industries),
  • Linde, Munich
  • Nipigas (Russia)
  • Wiesensee Petruschke & Partner Rechtsanwälte und Steuerberater GbR
  • Shell Gabon,
  • Patil Rail Infrastructure Pvt. Ltd., India,
  • BV Kuwait - AMEC / PMC,
  • Meisterlaser24,
  • Siemens/ Singapore
  • Deno Compressors B.V.,
  • Reintjes,
  • Indian Marine,  
  • Shipyards & others,
  • Renk Augsburg,
  • Voith Schneider,
  • Renk,
  • MAN,
  • Pipavav Defence and Offshore Engineering Company Ltd., India
  • Wärtsilä Finland Oy,
  • VIERECK HYDRAULIK,
  • Vulkan Nederland
  • GOA Shipyard,
  • China tianchen engineering coporation
  • Ontras Steinitz, Client: RMG Deutschland
  • Schottel,
  • Voith Turbo Schneider Propulsion / Heidenheim,
  • Shipyards,
  • WARTSlLA  &
  • Indian Navy & Shipyards,
  • RolIs-Royce AB, Kristinehamn, Sweden
  • Engineering SV, Sweden,
  • Aerzner Maschinenfabrik
  • HYDAC COOLING,
  • GE General Electric
  • CCC, Abu Dhabi
  • Dell
Different Scope of Inspections
  • Coating Inspection
  • Overspeed & Alignement Tests of Gas Turbines
  • Evaluation of Seecontainer
  • Final & Visual Inspection,
  • Final check of insulation system,
  • Witnessed Mechanical-Material test,
  • Hydrostatic pressure test,
  • Documentation Review / check,
  • Functional / Performance Test,
  • Visual check of welding seams of pedestal adapter,
  • Functional Test including transfer between Valves and Cabinet by simulation and trials in accordance with Factory Acceptance Protocol,
  • High Voltage test. Insulation Resistance before and after HV test.
  • Electrical functional test,
  • Verification of Calibration certificates of all equipments used for measurements,
  • NDE & Mechanical-Material Tests,
  • Centrifugal test with oil filled,
  • Tightness tests,
  • Centrifugal speed test,
  • Documentation & Welder's Certificates checks,
  • Electronic controls and cabinets tests,
  • Rudder Propeller casing hydraulically tests,
  • FATs are witnessing as per manufacturer's test protocols,
  • Witnessing Torsional Static Test to establish adequate bonding strength between elements,
  • Pressure test of shell on completion of fabrication,
  • Visual examination, dimensional check, verification scheme of connection,
  • Cable Inspection:
    a) Type Tests, ELECTRICAL: Bending Test, DC resistance of conductor and metallic screen, PD measurement, Calibration of conductor temperature
    b) Type Tests, NON-ELECTRICAL: Tests on XLPE Insulation: Hot set test, Installation for Heating cycle Test.
Suppliers / Vendors / Manufacturers in Germany and other countries
1. IN GERMANY (working for: Intertek, SGS-England, Bureau Veritas, American Bureau of Shipping, Indian Register of Shipping, Germanischer Lloyd and Individuales)
  • GERB > Berlin, Germany (2020~2021)
  • AEL > Leisnig, Germany (2019)
  • Artec > Oranienburg (2019)
  • BBM Elektrik > Cosweg (2019)
  • BGH  Edelstahl > Freital (2018-2019)
  • FST Industrie / Berlin (2011-2019)
  • Aerzner Maschinenfabrik, Aerzen (2019)
  • VELDE Standart Fasel, Köthen (2017)
  • Siemens, Leipzig, Nürnberg, Berlin, Görlitz, Erlangen,  (2011-2020)
  • RENK, Augsburg, Rheine,  (2012-2015)
  • Pleissner Guss, Herzberg am Harz,  (2013-2015)
  • Karl Diederichs, Remscheid,  (2012-2015)
  • Zollern, Herbertingen, (2011-2012)
  • Leistritz Pumps, Nürnberg, (2011-2015)
  • Exklusiv Laser, Luhe-Wildenau (2017)
  • MAN, Augsburg and Nürnberg, (2012-2015)
  • Alfing Kessler, Aalen, (2011-2015)
  • Günther+Schramm, Oberkochen, (2013-2015)
  • Zirro, Schrobenhausen, (2011-2012)
  • Borsig Berlin (2018-2020)
  • WILHELM SANDER FERTIGUNG GmbH, Bremen, (2012-2015)
  • ATB Schorch GmbH, Mönchengladbach,(2015)
  • Max Weishaupt, Schwendi, (2011-2012)
  • Elwa / Maisach, (2011-2015)
  • IPH GmbH, Berlin, Germany (2020~2021)
  • GEA ECO, Saarstedt, Berlin (2012, 2019)
  • HS-Cooler GmbH, Wittenburg, (2012-2015)
  • Jahnel-Kestermann, Bochum, (2012-2015)
  • Rickmeier GmbH, Balve, (2012-2015)
  • VOITH TURBO GMBH, Crailsheim, (2011-2012)
  • Netzsch, Waldkraiburg, (2011-2012)
  • Speck Triplex, Geretsried, (2011-2012)
  • Dickow, Waldkraiburg, (2011-2012)
  • Schottel GmbH, Spay, (2012-2015)
  • Hammerwerk Erft, Bad muensteifel, (2011-2015)
  • Boll & Kirch Filterbau, Kerpen, (2012-2015)
  • Behältertechnik Römer GmbH, Wenden, (2012-2015)
  • Schraubenwerk Zerbst GmbH, Zerbst, (2012-2018)
  • Vulkan Couplings, Herne, (2012-2015)
  • REXNORD ANTRIEBSTECHNIK, Dortmund, (2012-2015)
  • PRODAN Antriebselemente GmbH, Gäufelden, (2012-2015)
  • OLAER INDUSTRIES GmbH, Blieskastel, (2012-2015)
  • NK Neuenhauser Kompressorenbau GmbH, Neuenhaus (2012-2015)
  • Kolmeder / Ergolding, (2011-2012)
  • MTU / Friedrichshafen, (year: 2011-2012)
  • Harms, Magdeburg, (year: 2012-2015)
  • Sternberg GmbH / Hohenstein-Ernstthal, (2011-2015)
  • Voith Turbo, Heidenheim, (2011-2015)
  • KSB Halle, (2017-2019)
  • Diepa, Neustadt bei Coburg, (2011-2012)
  • Maschinenfabrik Neuman & Esser, Wurzen (2018)
  • MAP Ratenow (2011-2018)
  • Pro Beam, Burg (2017-2018)
  • Apollo, Gößnitz (2018)
  • Bosch Rexroth, Lohr am Main & Elchingen, (2011-2012)
  • Sosta, Könnern (2017-2018)
  • VDL DELMAS, Berlin (2017-2018)
  • Leser, Hohenwestedt (2018)
  • Chromalox + AEV, Bitterfeld (2018)
  • Deutz / Ulm, (2011-2012)
  • Allweiler / Radolfzell, (2011-2015)
  • BWB / Burgau, (2011-2012)
  • GEWES / Stadtilm, (2011-2015)
  • SHW / Aalen, (2011-2015)
  • SONDEX, Winsen, (2012-2015)
  • TABA / Pegnitz, (2011-2012)
  • HYDAC International, Sulzbach-Saar and Gera, (2012-2018)
  • Reintjes / Hameln, (2012-2015)
  • Silbitz Gus > Silbitz, (2011-2012)
  • ZF / Friedrichshafen, (2012-2015)
  • WILO > Hof, (2011-2012)
  • Apollo-Gößnitz, (2018 , 2019)
  • SICK > Ottendorf Orika, (2019-2020)
  • GKW & WSW, Wildau, (2011-2012)
2. IN OTHER COUNTRIES
  • BorgWarner > Landskrone, Sweden (2019 ~ 2020)
  • KRAL > Lustenau / Austria, (2011~2012)
  • Teufelberger > Wels / Austria, (2011-2012)
  • Hoerbiger / Wien / Austria, (2011-2012)
  • Voestalpine / Linz / Austria, (2011-2012)
  • Geislinger / Hallwang / Austria, (2011-2012)
  • Pameto / Helsinki / Finnland, (2012-2015)
  • Kromet / Elplag / Poland, (2012-2015)
  • Liebherr-Werk Nenzing / Nenzing / Austria, (2011-2012)
  • SKF Coupling System AB Hofors, Sweden, (2012-2015)
  • Specma AB, Örnsköldsvik, Sweden, (2012-2015)
  • Damen / Gdansk / Poland, (2012-2015)
  • Stama / Katowitz / Poland (2012-2015)
  • Stentor Srl, Curcani, Romania (2015)
  • Palfinger / Friedburg / Austria, (2011-2012)
Projects / Equipments / Materials
  • Vibration Isolation System (VIS),
  • Cable Inspection,
  • Condor boiler Hot Water Boiler,
  • Compressor,
  • Volute Casing,
  • Laser Machine,
  • Transformer,
  • Converter,
  • RCU (Re-Cooling Unit),
  • Motor,
  • Gear Casings,
  • Turbo Chargers & diff. Marine Components,
  • Control Panels / Switchboards,  
  • Gear Boxes (reduction gearing),
  • Gear Couplings,
  • Propeller Blades and Crankshafts,
  • Driving Sleeve & thrust plates,
  • Pumps & Flow meters,
  • Vulastik-L couplings,
  • Propeller Nozzles,
  • Hydraulic power pack for CPP system and Pumps,
  • BSD-Clamping Hubs, Finished machined Electromagnetically operated clutches/Couplings,
  • Gas Turbine
  • Screw spindle pumps,
  • Subsea Pumps,
  • Castings,
  • Forgings & Connecting rods,
  • Duplex filters,
  • Valves, Remote controlled Valve System,
  • Steel plates,
  • Couplings & Flywheels,
  • Cooling & Heating Units,
  • Pressure vessels,
  • Crankshafts,
  • Castings / Gear Box Casings,
  • Voith Schneider Propellers,
  • Voith Turbo couplings/ Dolphin Project,
  • Starting Air Receiver,
  • Fabricated Propulsion shaft couplings,
  • Plate heat exchangers (PHE),
  • Schottel Rudder Propellers,
  • Sleeper Screw Sc36: Rail Fastening
  • System W-300-1U for Tunnel (complete Sleeper Set)
  • Bevel Pinions,
  • Manifolds,
  • Special Screws,
  • Wire Ropes,
  • Heat exchangers,
  • Helical gear units,
  • Gear pumps,
  • Cranes,
  • Valves,
  • Gear Box-Casings,
  • Engines,
  • Electrical Panel,
  • Bevel gears,
  • Electric Motors,
  • Diesel Motors,
  • Brenner,
  • Polts
  • Accumulators
  • Bevel Gears,
  • Winch Gears,
  • Winch Ropes,
  • Filter systems.
  • Nozzles-Casings,
  • Starting Air Receiver,

Created 2017, Last update 24.12.2020 © owner Eng.: Mohamed El Bahry

Head Office: Berlin, Germany

E-Mail: Contact (at) Eurospect.de

Industrial 3rd & 2nd Party Inspection Service

Back to content